UFC 4-159-03
3 October 2005
INSPECTION. Mooring systems and components should be inspected
3-10
periodically to ensure they are in good working order and are safe. Table 3-17 gives
inspection guidelines.
Table 3-17. Inspection Guidelines
NOTES
MAXIMUM
MOORING
INSPECTION
SYSTEM OR
INTERVAL
COMPONENT
Surface inspection
Piers and wharves
1 year
Complete inspection - wood structures
3 years
Complete inspection - concrete and steel
6 years
structures
See NAVFAC MO-104.2, Specialized
Underwater Waterfront Facilities
Inspections; If the actual
capacity/condition of mooring fittings on a
pier/wharf is unknown, then pull tests are
recommended to proof the fittings.
Fleet Moorings
3 years
See CHESNAVFACENGCOM, FPO-1-
84(6), Fleet Mooring Underwater
Inspection Guidelines. Also inspect and
replace anodes, if required. More
frequent inspection may be required for
moorings at exposed sites or for critical
facilities.
Synthetic line
6 months
Per manufacturer's recommendations
58