DG-1110-3-119
Design Guide: Band Training Facilities
March 1983
LIST OF FIGURES
List of Figures
page
Chapter 1: Introduction
1-1
Band Training Facilities Project
1-3
Development Process
1-2
Recently Constructed Army Band
1-4
Facility
Chapter 2: Architectural Programming
2-1
2-2
Space Programming Process
Band Rehearsal (The U.S. Army
2-2
Band and Chorus; Brucker Hall,
Ft. Myer, Va.)
2-4
2-5
2-3
Small Group Practice
Audio Control and Recording
2-5
2-4
2-5
2-5
Music Library (Brucker Hall)
2-5
2-6
Band Administration
2-7
2-6
Individual Instrument Storage
Large Instrument Storage
2-8
2-6
2-7
2-9
Outdoor Performance
2-10 Spaces and Relationships for Army
2-9
Band Training Facilities
2-10
2-11 Site Evaluation Criteria
2-12 Band Training Facility within
2-11
Renovated Existing Building
2-13 Band Training Facility in Renovated
2-11
Existing Building plus Additions
Chapter 3: General Design Considerations
Site Zoning
3-1
3-2
Outdoor Performance Area
3-2
3-2
Access Separation
3-3
3-3
Band Image
3-4
3-4
Ample and Clear Circulation
3-5
3-5
Example Renovation Design
3-6
3-6
3-7
Single Story Facility
3-7
Public and Private Zones
3-8
3-8
Use Sequences and Building
3-9
3-9
Relationships
3-10
3-10 Supervision Relationships
3-11
3-11 Space-to-Space Relationships
3-12 Independent Construction for Sound
Isolation
3-12
3-13 Manufactured Sound Module
3-13
3-14 Ductwork Design to Reduce Sound
Transmission
3-13
3-15 Treatment of Echoes
3-14
3-16 Elimination of Flutter with a Splayed
3-15
Wall
Chapter 4: Space Criteria
4-1
Illustrative Main Rehearsal Rooms
4-2
4-2
Illustrative Large Group Practice
Rooms
4-5
4-3
Illustrative Small Group Practice
4-6
Rooms
4-6
4-4
Illustrative Individual Practice Rooms
4-5
Illustrative Recording/Audio Control
Booth
4-8
Illustrative Library Plan
4-6
4-9