MIL-HDBK-1027/1B
movement. Hoses should lay on an angle to promote drainage.
Provide one rack per training structure.
2.4.5
Maintenance Contractor Area. The maintenance
contractor area should be a work or office type room with a 2450
mm high ceiling to be used by the device maintenance contractor.
The minimum floor areas should be as follows:
a)
For 19F5, 19F5A, 21C12, and 21C12A trainers,
11 sq. m.
b) For 19F1A, 19F1B, 19F3, 19F3B, 19F3A, 19F3C, 19F4,
or 19F4A trainers, 45 sq. m.
c) For other training devices, locate the maintenance
contractor area at the utility building or other support
building.
2.4.5.1
Room Provisions.
Provide the room with the following:
a)
Telephone connection
b)
c)
120 volt, single phase, heavy duty electrical
outlet
d)
Lighting
e)
Lockable door
2.5
2.5.1
General. Firefighting training facilities are
procured through two separate contracts. The first is a
construction contract which provides the training structure, the
site development, the supporting facilities, and the utilities.
The second is a device contract which provides the trainer,
computer, and its related equipment. Everything discussed in
this handbook should be provided by the facilities contractor
unless indicated otherwise. Two copies of military construction
(MILCON) project facility drawings and any changes thereof, and
as-builts should be supplied to NAWCTSD when available.
28