MIL-HDBK-1027/1B
2.5.2
Device Contractor. The device contractor should
provide the following equipment:
a)
Fireplace mockups
b)
Nonfireplace mockups
c)
Telltale and obscuration smoke systems
d)
Halon and aqueous potassium carbonate (APC) agent
simulators
e)
Explosive gas monitoring system (propane
f)
Temperature and safety monitors
g) Training and maintenance communication devices
h)
Ventilation devices used by the trainee
i)
Shiplike labelings
j)
Power ventilation necessary to distribute smoke
k)
Equipment necessary to "clean up" electrical
service
l)
Equipment necessary for electromagnetic shielding
m)
Special compartment lighting
n)
Bulkhead rib insulation (21C12)
o)
Partitions in 21C12 instructor's station
p)
Flush deck nozzle system (19F4)
q)
Bulkhead flapper (21C12 and 21C12A)
r)
Red Devil blower and adapter (21C12 and 21C12A)
29