UFC 4-214-02
24 July 2003
ATTACHMENTS
NO.
TITLE
NOTES
11
LIST OF DRAWINGS
USACE Design Activity to provide.
USACE Design Activity to provide. This
12
ASBESTOS AND LEAD PAINT SURVEY
attachment will only be used for projects
RESULTS
which include demolition requirements.
2-6.2 Technical Specifications. The technical specifications included in the solicitation as Attachment
#1 to the statement of work represent the project administration type specifications. Inclusion of USACE
guide technical specifications into the design build package is discouraged.
2-6