UFC 4-214-02
24 July 2003
e. Sanitary Sewer System. This subfactor is considered important due to the desire to maintain a gravity
sanitary sewer system. Consideration shall be given to the placement of sanitary sewer mains, provisions
for cleaning, and to the inclusion of a pumping station/force main if required by the site development.
Included in this subfactor is the evaluation of actual materials proposed for installation.
Other Considerations: Oil/Water Separator, Protection from Contamination
/__ / Excellent
/__ / Above Average /__ / Average /__ / Poor /__ / Unacceptable
Proposal Strengths. Include narrative comments with respect to proposal strengths in the area of
Sanitary Sewer System design. Comments are required for all ratings above "AVERAGE".
Proposal Weaknesses. Include narrative comments with respect to proposal weaknesses in the area
of Sanitary Sewer design. Comments are required for all ratings above "AVERAGE".
Other Comments. Include any other comments with respect to Sanitary Sewer design here.
Appendix B Page 35