UFC 4-214-02
24 July 2003
f. Storm Sewer System. This subfactor is considered important due to the desire to maintain a gravity
storm sewer system. Consideration shall be given to the placement of storm sewer mains, provisions for
cleaning, and to the inclusion of a retention pond if required by the site development. Included in this
subfactor is the evaluation of actual materials proposed for installation.
Other Considerations: Prevention of Contamination, runoff control
/__ / Excellent
/__ / Above Average /__ / Average /__ / Poor /__ / Unacceptable
Proposal Strengths. Include narrative comments with respect to proposal strengths in the area of
Storm Sewer System design. Comments are required for all ratings above "AVERAGE".
Proposal Weaknesses. Include narrative comments with respect to proposal weaknesses in the area
of Storm Sewer design. Comments are required for all ratings above "AVERAGE".
Other Comments. Include any other comments with respect to Storm Sewer design here.
Appendix B Page 36