Project Name
Project Number
TEMF
Statement of Work
UFC 4-214-02, 24 Jul 03
Table
Title
Page
[2.A
Mechanics Per Repair and Scheduled Maintenance Bay ......................................
6]
4.1
Soil Compaction .....................................................................................................
46
4.2
Minimum Pipe Insulation Thickness (mm) For Steam (100 to 2,800 kPa (gage))
and High Temperature Hot Water Supply and Return (120 to 230 degrees C)
58
4.3
Minimum Pipe Insulation Thickness (mm) For Condensate Return and High
Temperature Hot Water Return System...........................................................
59
9.1
Lighting Levels .......................................................................................................
81
10.1
Indoor Design Data ................................................................................................
84
10.2
Internal Loads.........................................................................................................
85
FIGURES
Title
Page
Figure
2.1
Repair Bay Floor Plan ............................................................................................
8
2.2
Scheduled Maintenance Bay Floor Plan ................................................................
11
2.3
Maintenance Pit Details..........................................................................................
12
2.4
IFTE Dock Perpendicular to Building .....................................................................
36
2.5
IFTE Dock Parallel .................................................................................................
36
2.6
Diagrammatic Section of IFTE Dock Parallel to Building .......................................
37
SOW-v