Project Name
Project No. ___________
UFC 4-214-02, TEMF, 24 Jul 03
ATTACHMENT 12
ASBESTOS AND LEAD PAINT SURVEY RESULTS
If the project includes the demolition of existing structures, the provision of the asbestos and lead
survey and testing results is imperative to the success of the project. USACE Design District must
include this information in the solicitation.
Typically the Installation can provide this information for inclusion in the solicitation, if this information
is not available from the Installation, the Design Distict shall have these surveys conducted and
completed during the development of the solicitation.