Project Name
Project No. ___________
UFC 4-214-02, TEMF, 24 Jul 03
ATTACHMENT 8
GEOTECHNICAL REPORT
USACE Design District shall include in this attachment the geotechnical report for the proposed
construction site. This report should include boring logs, a site map identifying bore hole locations,
and an engineering analysis of the soils information which makes recommendations and conclusions
with respect to the suitability of the existing site soils to support the proposed project. Investigations
should be performed to a level which assures adequate information to determine the general type of
structure best suited to the site conditions and sufficient to ascertain the costs of the project. See
Statement of Work paragraph 4-1.1 for suggested report content suitable for general type structure
best suited for the site conditions.
If the USACE Design District Geotechnical Engineer feels that the site conditions warrant specific
mandatory requirements for a particular project, those requirements must be included in the Statement
of Work as well as included in this appendix.
ATT 8-i