UFC 4-721-11.1
26 Nov 01
PROPOSAL RATING WORKSHEET
FACTOR 1-2
OFFEROR PROJECT KEY PERSONNEL
Offeror: ________________________________________
Evaluator:_______________________________________
1. General: Evaluators will use this item to document receipt of Proposal Information with respect to Key
Personnel.
Does the Proposal Include Identifications of the Key Personnel?
____ YES ___ NO
2. Key Personnel: Review and evaluate the proposed Offeror personnel to be included on this project
team. Have these individuals worked Design/Build projects together previously? Do the key construction
staff (superintendent, CQC, Project Manager) have experience with "fast-track" design/build projects? Are
the designers of record registered professional engineers? Are the designers suitably experienced in their
field to provide them a suitable level of design expertise? Based on that review, provide a rating for the
Offeror proposed project team below. Include a listing of any apparent weaknesses or strengths of the
offeror and the proposed project team.
/__/ Outstanding /__/ Above Average /__ / Satisfactory /__ / Marginal /__ / Unsatisfactory
/__ / Unknown
2a Strengths: Include a listing of any identified or obvious strengths of the offeror with respect to Offeror
Subcontractor Management.
2b Weaknesses: Include a listing of any identified or obvious weaknesses of the offeror with respect to
Offeror Subcontractor Management.
2c Other: Include any other comments/rational to support the overall rating provided for this offeror.
Appendix A Page 12