SECTION/
ATTACHMENT
NUMBER
DESCRIPTION
10
FIRE FLOW DATA
11
LIST OF DRAWINGS
12
ASBESTOS AND LEAD PAINT SURVEY RESULTS
13
[Additional Attachments may be included if necessary]
NOTES
1. See additional tables of contents in each section for paragraph references. See the Technical
Specifications table of contents for specification sections included in this solicitation/contract.
2. Drawings are provided as a separate package.
NOTES TO USACE ACTIVITY PREPARING SOLICITATION
1.
Contracting guidance contained herein should not be used as a substitute for thorough knowledge
of the current acquisition regulations. If a conflict arises between this guidance and the acquisition
regulations, the acquisition regulations govern.
2.
Local provisions and clauses may be substituted.
3.
General Wage Decisions, although not specifically listed as an attachment to the Statement of Work
must be included in the complete solicitation.
4.
||content||
\ Electronic editable versions of these documents are available from Norfolk District.
Point of
Contact, Mr. Peter G. Reilly, Peter.G.Reilly@usace.army.mil /1/