Project Name
Project Number
UEPH Complex
Statement of Work
26 November 2001
Table 4.5 Minimum Pipe Insulation Thickness (inches)
For Condensate Return and High Temperature Hot Water Return System
Nominal
Paroc
Epitherm
Kaylo-10
Pipe
Delta
Thermo-12
Polyurethane
Diameter
Super
(inches)
Caltemp
-------------------------------------------------------------------------------------------------
1.0
1.5
2.0
3.0
N/A
1.5
1.5
2.0
3.0
N/A
2.0
1.5
2.0
3.0
0.77
2.5
1.5
2.0
3.0
N/A
3.0
2.0
2.5
3.5
1.05
4.0
2.0
2.5
3.5
1.05
5.0
2.0
2.5
3.5
N/A
6.0
2.5
3.0
4.5
1.32
8.0
2.5
3.0
4.5
N/A
10.0
3.0
4.0
5.0
N/A
12.0
3.0
4.0
5.0
N/A
14.0
3.0
4.0
5.0
N/A
16.0
3.0
4.0
5.0
N/A
18.0
3.0
4.0
5.0
N/A
4-16.5
Expansion loops and bends. Stresses shall be less than the maximum allowable
stress from the Power Piping Code (ASME B31.1). Detailed design layout drawings and stress
and anchor force calculations shall be provided for all loops and bends. Locations of all
anchors, guides and supports shall be shown. Pipe-stress and system-expansion calculations
for each expansion compensation elbow using a finite element computer generated 3
dimensional analysis. Calculations shall demonstrate that pipe stresses from temperature
changes are within the allowable requirements in ASME B31.1 and that the anchors and the
guides will withstand the resultant forces. Detailed design layout drawings shall include all
analysis node points. As a minimum, computer analysis results shall include node stresses,
forces, moments and displacements. Calculations shall be stamped by a registered
Professional Engineer in the employ of the system manufacturer.
4-16.6
Manholes and anchors. Design and installation shall be in accordance with the
published data of the manufacturer.
4-16.7
Installation. The piping system furnished shall be installed in accordance with the
piping system manufacturer's instructions. The Contractor shall obtain the services of a trained
representative of the pipe system manufacturer to instruct the Contractor's work forces in the
installation procedures to ensure that the system is installed in accordance with the
manufacturer's published instructions and the plans and specifications. The manufacturer's
representative shall be a person who regularly performs such duties for the manufacturer.
4-16.8 Testing. The carrier piping shall be hydrostatically tested at 1 times the working
pressure for the system. The casing shall be tested in accordance with the manufacturer's
recommendations.
4-17
FUEL OIL STORAGE AND DISTRIBUTION. [Insert "DELETED" if not applicable
and delete remainder of text in all paragraphs.] Fuel oil storage and distribution system shall be
SOW-101