FIGURE C-2.4. SAMPLE COMPLETED INTERACTIVE WORKSHEET FOR AN
ARMY FIRE STATION (continued)
Dispatch
m2
ft.2
Dispatch includes Dispatch Bathroom at:
Dispatch includes Dispatch Kitchenette at:
Dispatch includes Additional IT Room Space space at:
Only available with Dispatch.
Building Totals
Subtotal - Total Net Building Area
7,206
669.4
Net-to-Gross factor (modify as necessary):
(factor at 0.22)
1,585
120.5
* The net-to-gross factor accounts for circulation space, mechanical space, and wall thicknesses. The net-to-
gross multiplier for Fire Stations may vary from 18% to 22% depending on the size of the Apparatus Room
relative to the rest of the facility. Typically, the larger the Apparatus Bay, the lower the multiplier and vice versa.
However, carefully consider the entire building configuration before changing the factor from the default setting
of 22%.
TOTAL GROSS BUILDING
Summary for Army Fire Station:
8,791
789.9
Type of Facility = Structural
Class of Facility = Satellite
Total Dorm Room Count = 12
Total No. of Apparatus Bays = 2
Site
m2
ft.2
Based on selections entered above, Staff Parking is sized:
1,003.3
10,800
Based on selections entered above, Visitor Parking is sized:
83.6
900
Based on selections entered above, Bicycle Rack Area is sized:
14.9
160
Based on selections entered above, Site Approach to Apparatus Bays is sized:
371.6
4,000
Based on selections entered above, Agent Storage (ARFF) is sized:
Based on selections entered above, Agent Storage (Structural) is sized:
4.5
48
Based on selections entered above, Patio is sized:
13.9
150
TOTAL GROSS SITE SUPPORT
16,058
1,491.8
TOTAL GROSS FACILITY (BUILDING + SITE SUPPORT)
2,281.7
24,849
C-9