DG 1110.3.120
DESIGN GUIDE: MUSIC AND DRAMA CENTERS
JANUARY 1981
C H A P T E R 4: CONSTRUCTION DETAILS
4-6. CONSTRUCTION
Since the basic house central cluster reinforce-
DETAILS
ment system is of minimal scope for the Army
program, it is further suggested the designer fur-
nish sufficient on-stage A.C. power so that tour-
ing groups utilizing their own portable sound
systems can set them up rapidly, allowing suf-
These sample details are furnished to illustrate
ficient time for their technical personnel to con-
the unusual aspects of performance facility con-
duct pre-performance sound checks. This pro-
struction. They are by no means exhaustive or
vision is mandatory for the 650 Seat Drama
prescriptive in definition, but the criteria exem-
Room and 1400 Seat Music Room having no re-
plified will most often be mandatory.
inforcement systems.
4-25