UFC 3-430-02FA
15 May 2003
UNIFIED FACILITIES CRITERIA (UFC)
CENTRAL STEAM BOILER PLANTS
Any copyrighted material included in this UFC is identified at its point of use.
Use of the copyrighted material apart from this UFC must have the permission of the
copyright holder.
U.S. ARMY CORPS OF ENGINEERS (Preparing Activity)
NAVAL FACILITIES ENGINEERING COMMAND
AIR FORCE CIVIL ENGINEER SUPPORT AGENCY
Record of Changes (changes are indicated by \1\ ... /1/)
Change No.
Date
Location
This UFC supersedes TM 5-810-15, dated 1 August 1995. The format of this UFC does not conform
to UFC 1-300-01; however, the format will be adjusted to conform at the next revision. The body of
this UFC is a document of a different number.
1