UFC 3-430-07
24 July 2003
including Change 1, Jan 2004 and Change 2, March 2005
\ Table 3-3 Inspection and Test Frequencies - UPVs (Special Cases)
Item
Internal Inspection
External Insp. &
Hydrostatic Test
Operational Test
MILSPEC
Every 3 years of
Every 3 years of
See note 2
Vessels
service. Inspection
service. Inspection
must include test and
must include test and
See note 1
valves and pressure and
valves and pressure and
temperature gages.
temperature gages.
See Note 1.
For MILSPEC Vessels (Pressure Vessels Design, Built and Stamped to MIL-F-
22606) or any non-ASME vessels see Note 3.
Hyperbaric
Every 3 years of
Every 3 years of
Every 6 years of service. If
Facility Support
service. Inspection
service. Inspection
inspection shows no sign of
Pressure Vessels
must include test and
must include test and
corrosion, the test may be
verification that safety
deferred until the next
See note 4
valves and pressure
valves and pressure
inspection, but must be
gauges. After repair or
gages are within
tested at least every 12
alteration.
years. After any repair or
or alteration.
alteration of the pressure
See Note 1
parts. Additional times at the
discretion of the inspector. In
accordance with Paragraph
5-4.3 and 5-4.5.
For MILSPEC Vessels (Pressure Vessels Design, Built and Stamped to MIL-F-
22606) or any non-ASME vessels see Note 3.
Carbon Dioxide
Only if the vessel has
Every 3 years; or after
After any repair or alteration
(CO2) Storage
been depressurized or
any repair or alteration
of pressure parts; or when
Tanks
has been opened to the of pressure parts; or
directed by an authorized
atmosphere other than
when directed by an
boiler inspector. Caution
See note 5
for immediate repair or
authorized boiler
should be taken in performing
maintenance; or when
inspector.
hydrostatic testing. It is
directed by an
essential that all water be
authorized boiler
See note 6
removed from the vessel
inspector.
before returning it to service.
Water will freeze and create
blockages.
Liquid Petroleum
Every 3 years or more
After any repair or alteration
Every 3 years or more
Gas (LPG)
frequently as
of pressure parts, otherwise
frequently as
Storage Tanks
determined by
at the discretion of the
determined by
procedures in the NBBI
inspector.
procedures in the NBBI
Code. After any repair
Code. After any repair
or alteration of pressure or alteration of pressure
parts. Use ultrasonic
parts. Bench test or
testing instead of visual
replace the UL or ASME
internal inspection.
safety valves every 6
years.
See note 7
Notes:
1.
A visual internal inspection for MILSPEC vessels or other hyperbaric support pressure vessels