Figure G-7. Wiring Diagram
Figure G-8. Differential Temperature Controller
G-5.
COSTS
a. Development Costs. The development costs for this system were
determined based upon the engineering and drafting hours required in the design and
construction of the system. The Systems Corp development costs for the project were
as follows:
G-6