Table 14-2. Checklist for In-pavement Lights
Progress Inspection
____ 1. Are all equipment and materials new, and as specified? Are transformer housings of
the correct type, size and material? Are lamps of proper wattage? [Items covered
by the FAA L-800 series should be listed in the FAA AC 150/5345-53.]
____ 2. Are the recesses for inset lights or light bases being located within the allowable
dimensional tolerances?
____ 3. Is the coring and sawing equipment capable of producing acceptable recesses and
kerfs?
____ 4. Is the recess diameter and depth in accordance with the plans? Is the width and
depth of the saw kerfs in accordance with contract requirements?
____ 6. Are the inset light base jigs capable of accurate receptacle/light base alignment and
of holding the receptacle/light base firmly during pouring and curing of concrete?
____ 7. Are the light bases being aligned and leveled within the allowable tolerances, and
housings must be proper depth below grade, depending on type of fixture and
allowance for spacers and pavement ring, as required by plans and manufacturer's
instructions.]
____ 8. If epoxy is required:
- Has the epoxy manufacturer supplied adequate and clear instructions for mixing,
handling, and installation of the material, and are the instructions being followed?
- Is material being machine mixed, and are sample tests of the epoxy being
made?
- Are the temperatures (air and pavement) within allowable tolerances for the type
of epoxy being used?
____ 9. Are the ends of all wires sealed when they are not being immediately connected?
____ 10. Are the L-823 connectors of proper size and do they properly fit the cable?
____ 11. Has taping/heat shrink for field attached connectors been applied properly, per
details?
____ 12. Are the plywood or steel covers kept on the light bases until just before installation
of the light fixture, in order to prevent entry of any foreign matter?
____ 13. Are the receptacles/light bases cleaned and dried before installation of the light
fixtures?
____ 14. Are all bolts of stainless steel and torqued per manufacturer's instructions?
____ 15. Has grounding of light base been provided in accordance with the plans?
____ 16. Where secondary wires are installed in conduit which is epoxy sealed in saw kerfs:
____ a. Is the width and depth of the saw kerfs as required by plans?
____ b. Are the recesses and saw kerfs properly sand blasted, cleaned, and dried
just before installation and sealing of the conduit or wire?