MIL-HDBK-1003/7
16.5.2
Ventilating........................................177
16.5.3
16.6
Cranes and Hoists..................................177
16.6.1
General............................................177
16.6.2
Cranes.............................................177
16.6.3
Hoists.............................................177
16.7
Metering...........................................178
16.8
Drainage...........................................178
16.9
Seismic Design Criteria............................178
16.9.1
Power Plant Buildings..............................178
16.9.2
Piping.............................................178
16.9.3
Equipment..........................................178
16.9.4
Controls...........................................178
16.10
Architectural Criteria.............................178
16.10.1
Outdoor and Semi-Outdoor Plants....................178
16.10.2
Arrangements.......................................179
16.10.3
Criteria Source....................................179
16.11
Structural Criteria................................179
16.11.1
Foundations........................................179
16.11.2
Platform and Ladders...............................180
16.11.3
Typhoon or Hurricane Considerations................180
16.11.3.1
Miscellaneous......................................180
16.11.3.2
16.11.4
Collateral Reading.................................180
16.12
Electrical Criteria................................180
16.13
16.13.1
Plant Operation and Maintenance Manual.............180
16.13.1.1
System designation.................................180
16.13.1.2
Description of System and Associated
Major Equipment..................................180
16.13.1.3
Operation..........................................181
16.13.1.4
Maintenance........................................181
Page
16.13.1.5
Troubleshooting....................................181
16.13.1.6
Drawings...........................................181
16.13.2
17.1
Air Quality Control................................183
17.1.1
Pollutant Production...............................183
17.1.2
Emission Limits....................................183
17.1.3
Equipment Selection................................183
17.1.4
Monitoring and Reporting...........................183
17.2
Water Quality Control..............................184
17.2.1
Waste Streams......................................184
17.2.2
Discharge Standards................................186
17.2.3
Treatment and Disposal Methods.....................186
17.2.3.1
Recycle Basin......................................186
17.2.3.2
Chemical Wastewater................................186
17.2.3.3
Sanitary Wastewater................................186
17.2.3.4
Storm Water Runoff.................................186
17.2.3.5
Leachate and Runoff From Coal Storage Areas........186
17.2.3.6
Oily Wastewater....................................186
17.3
Oil Spill Control..................................186
17.3.1
Possible Sources of Spills.........................186
17.3.1.1
Bulk Oil Storage Tanks.............................187
17.3.1.2
Lube Oil Tanks.....................................187
17.3.1.3
17.3.2
Methods of Prevention..............................187
17.3.3
Methods of Cleanup.................................187
17.4
Solid Waste Disposal...............................188
xiii