MIL-HDBK-1003/7
41
Types of Automatic Controller Action...............152
42
Hysteresis Caused by Friction in a Valve...........154
43
Multiple Pump Pits.................................161
44
Sump Dimensions Versus Flow........................162
45
Sump Dimensions Plan View..........................163
46
Sump Dimensions Elevation View.....................164
47
Principal Steps in the New Source Review Process...211
48
Combined Cycle.....................................262
TABLES
Page
1
Plant Location Factors..............................12
2
Power Plant Loads for Design........................16
3
4
Maximum Velocities (FPS) in Convection Sections
for Coal, Wood, or Solid Waste Boilers............31
5
Stoker Selection Criteria...........................33
6
Equipment Selection for Boiler Plants...............39
7
Typical Gross Turbine Heat Rates....................54
8
Theoretical Steam Rates LB/KWH......................56
9
Direct Connected Condensing Steam Turbine
Generator Units...................................64
10
Turbine Throttle Steam Pressures and Temperatures...65
11
Typical Turbine Throttle Steam Pressure
Temperature Conditions............................65
12
Typical Turbine Exhaust Pressure....................66
13
Typical Design Conditions for Steam Condensers......99
14
Typical Condenser Tube Length VS Surface...........100
15
Typical Condenser Size and Cooling Water Flow......101
16
Recommended Tube, Tube Sheet, and Water Box
Materials........................................105
17
Recommended Tube Gauge, Water Velocity, and
Application......................................106
18
Materials to Failure.............................107
19
Venting Equipment Capacities for Single Shell
Condenser........................................113
20
Hogger Capacities..................................113
21
Typical Distribution of Boiler Ash.................130
22
List of Instruments on Control Panels..............136
23
Sensing Elements for Controls and Instruments......138
24
25
Flowmeter Selection Table..........................148
26
Cooling Water Treatments...........................166
27
Permissible Noise Exposures........................169
28
Typical Fixed Fire Detection and Suppression
Systems..........................................173
29
EPA Emission Sampling Techniques...................184
30
Primary and Secondary Ambient Air Quality
Standards........................................191
31
Commercial-Institutional Steam Generating Units
Larger than 100 MBTU/HR Input Rate...............193
xviii