Task (Assumes Equipment Is Energized,
Hazard/Risk
and Work Is Done Within the Flash Protection Boundary See Note 7)
Category
Outdoor disconnect switch operation (gang-operated, from grade)
2
Note 1. Maximum of 25 kA short circuit current available, 0.03 second (2 cycle) fault clearing time.
Note 2. Maximum of 65 kA short circuit current available, 0.03 second (2 cycle) fault clearing time.
Note 3. For < 10 kA short circuit current available, the hazard/risk category required may be reduced
by one number.
Note 4. Maximum of 42 kA short circuit current available, 0.33 second (20 cycle) fault clearing time.
Note 5. Maximum of 35 kA short circuit current available, up to 0.5 second (30 cycle) fault
clearing time.
Note 6. For < 25 kA short circuit current available, the hazard/risk category required may be reduced
by one number.
Note 7. Refer to Table 130.7(C)9(a) in NFPA 70E for additional information.