Work on energized parts, including voltage testing
2*
Application of safety grounds, after voltage test
2*
Revenue meters (kW-hour, at primary voltage and current)
--
Insertion or removal
2*
Cable trough or tray cover removal or installation
1
Miscellaneous equipment cover removal or installation
1
Work on energized parts, including voltage testing
2*
Application of safety grounds, after voltage test
2*
NEMA E2 (fused contactor) Motor Starters, 2.3 kV Through 7.2 kV
Contactor operation with enclosure doors closed
0
Reading a panel meter while operating a meter switch
0
Contactor operation with enclosure doors open
2*
Work on energized parts, including voltage testing
3
Work on control circuits with energized parts 120 V or below, exposed
0
Work on control circuits with energized parts >120 V, exposed
3
Insertion or removal (racking ) of starters from cubicles, doors open
3
Insertion or removal (racking) of starters from cubicles, doors closed
2
Application of safety grounds, after voltage test
3
Removal of bolted covers (to expose bare, energized parts)
4
Opening hinged covers (to expose bare, energized parts)
3