CEMP-E/CECW-E
EI 01D010
1 September 1997
EM
Engineer Manual
EP
Engineer Pamphlet
EPA
Environmental Protection Agency
ER
Engineer Regulation
FAR
Federal Acquisition Regulation
FOA
Field Operating Activity
FOB
Freight on Board
FOIA
Freedom of Information Act
FOUO
For Official Use Only
FS
Feasibility Studies
FULLY FUNDED
This term is used to indicate that the costs presented include allowances for
cost growth due to inflation through project completion. Certain estimates
by definition include cost growth and are considered fully funded.
G&A
General Home Office Overhead
GE
Government Estimate
GFE
Government Furnished Equipment
GFM
Government Furnished Material
HAG
HCAS
Historical Cost Analysis System
HQUSACE
Headquarters, U. S. Army Corps of Engineers
HTRW
Hazardous, Toxic and Radioactive Waste
IDLH
Immediately Dangerous to Life or Health
IDT
Indefinite Delivery Type
IFB
Invitation for Bid (Sealed Bidding)
IPMP
Initial Project Management Plan
LCC
Life Cycle Cost
LERRD
Land, Easement, Right-of-way, Relocation and Disposal
MCA
Military Construction, Army
MCACES
Microcomputer Aided Cost Engineering System
MCP
Military Construction Program
MILCON
Military Construction
MSC
Major Subordinate Command
MWBS
Military Work Breakdown Structure
NORM
Normally Occurring Radioactive Materials
OMB
Office of Management and Budget
O&M
Operation and Maintenance
OMRR&R
Operation, Maintenance, Repair, Rehabilitation and Replacement
OMSC
Operating Major Subordinate Command
PA
Preliminary Assessment
PED
Preconstruction Engineering and Design
Glossary-2