UM = OL
Construction Cost Factor (CCF)
,531.00/OL, based on data provided by USACE, and deflated to FY04 $ using a deflation factor
of 0.985.
Sustainment Cost Factor (SCF)
5.02/OL, the sustainment factor was calculated using a ratio from FAC 7345 (2.98%) as no
other auditable data was available.
No Layout Available