UM = SF
Construction Cost Factor (CCF)
0.62/SF, based on data provided by AFCESA, and deflated to FY04 $ using a deflation factor
of 0.985.
Sustainment Cost Factor (SCF)
.41/SF, the sustainment factor was calculated using a ratio from FAC 7345 (2.98%), pending
identification of the components that are included in the CCF so a MARS calculation can be performed.
No Layout Available