UM = SF
Construction Cost Factor (CCF)
8.71/SF, based on data provided by USACE, and deflated to FY04 $ using a deflation factor of
0.985.
Sustainment Cost Factor (SCF)
.28/SF, the sustainment factor was calculated using a ratio from FAC 1311 (1.73%), pending
identification of the components that are included in the CCF so a MARS calculation can be performed.
No Layout Available