UM = EA
Construction Cost Factor (CCF)
,132.71/EA, based on data provided from the Air Force, and inflated to FY04 $ using the
appropriate OSD inflation factors.
Sustainment Cost Factor (SCF)
0.90/EA, the sustainment factor was calculated using a ratio from FAC 2123 (1.58%) as no
other auditable data was available.