UM = EA
Construction Cost Factor (CCF)
,447.96/EA, based on data reported by the various Services, inflated to FY04 $ using a
inflation factor of 1.015. The EA is based upon a concrete landing ramp, large enough to berth a small
ferry or landing craft.
Sustainment Cost Factor (SCF)
8.41/EA, the sustainment factor was calculated using the ratio from FAC 1541 (1.43%) as no
other auditable data was available.