UM = SF
Construction Cost Factor (CCF)
3.00/SF, based on data provided from TriService #5/1, deflated to FY04 $ using a deflation
factor of 0.97.
Sustainment Cost Factor (SCF)
.60/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 10,192 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,485,790
Building GSFT: 10,192
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,831
,458
,363
,280
Unscheduled
,931
,482
,444
,348
Renewal &
Replacement:
,500
,155
,134
Total M&R Costs:
,762
,440
,962
,761
As % of replacement:
0.79%
1.04%
1.82%
2.48%
Per gsft:
||content||
.16
||content||
.51
.65
.60
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
7071
Sq Ft
Tankless Water Closet
12
Each
Clay Brick, Exterior, 2nd Floor
7071
Sq Ft
Urinal, Vitreous China
6
Each
Concrete, Painted, Exterior, 1st Floor
3150
Sq Ft
Circulator Pump, 1/12 HP, Hot Water
1
Each
Stairs, Exterior and Decking
700
Sq Ft
Pipe & Fittings, 2" Copper, Cold Water
2
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
10
Each
Pipe & Fittings, 3/4" Copper, Cold Water
1.5
K Ln Ft
Aluminum Operable Window, 12 sf, 1st Floor
16
Each
Pipe & Fittings, 3/4" Copper, Hot Water
1.5
K Ln Ft
Aluminum Operable Window, 12 sf, 2nd Floor
5
Each
Pipe Insulation, Cold Water
1.5
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
2
Each
Pipe Insulation, Hot Water
1.5
K Ln Ft
Steel Double 12'x24', Painted, Roll-up Door
0
Each
Water Heater, Electric 52 Gal.
1
Each
Steel w/ Safety Glass, Painted, Exterior Door
3
Each
Pipe & Fittings, 6" Cast Iron
1
K Ln Ft
Steel, Painted, Exterior Door
3
Each
Pipe & Fittings, 4" DWV PVC
0.3
K Ln Ft
Built-up Roof
4350
Sq Ft
Roof Drain, 4-6"
2
Each
Wood, Solid Core w/ Safety Glass, Painted, Interior Door
5
Each
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Wood, Solid Core, Painted, Interior Door
58
Each
Variable Air Volume Box
6
Each
Concrete Interior Steps
250
Sq Ft
Air Conditioner, Rooftop, 20 Ton
2
Each
Metal Interior Railing, Painted
50
Ln Ft
Fan Coil, Two-Pipe, 400 Cfm
2
Each
Ceramic Tile Wall Finish
1830
Sq Ft
Fire Sprinkler Head
120
Each
Concrete Block, Painted, Interior Wall Finish
1410
Sq Ft
Circuit Breaker, Main, 600 V, 800 Amp., 3 Ph.
1
Each
Fabric Interior Wall Finish
160
Sq Ft
Distribution Panel Board
2
Each
Plaster Interior Wall Finish
6440
Sq Ft
Motor Starter, 5-20 HP, <600 V
4
Each
Sheetrock, Unstippled, Interior Wall Finish
16160
Sq Ft
Emergency Lighting Pack, 2 Light w/ Battery
6
Each
Carpet, Nylon 20 oz., Low Traffic
4210
Sq Ft
Fluorescent Lighting Fixture, 160w
28
Each
Ceramic Tile Flooring
2350
Sq Ft
Incandescent Lighting Fixture, Basic, 100w
9
Each
Concrete, Finished Flooring
560
Sq Ft
Receptacle, 120V, 15 Amp
125
Each
Vinyl Tile Flooring
575
Sq Ft
Wiring Device, Switch
63
Each
Acoustical Tile Ceiling
6435
Sq Ft
Fire Alarm Bell, 6"
3
Each
Plaster Ceiling
515
Sq Ft
Fire Alarm Control Panel
1
Each
Sheetrock, Unstippled, Ceiling
385
Sq Ft
Manual Pull Station
4
Each
Drinking Fountain, Vitreous China
2
Each
Public Address Speaker
1
Each
Lavatory, Vitreous China
10
Each
Smoke Detector
13
Each
Service Sink, Iron Enamel
2
Each
Time Control Clock
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle