UM = SF
Construction Cost Factor (CCF)
3.00/SF, based on data provided from TriService #5/2, deflated to FY04 $ using a deflation
factor of 0.97.
Sustainment Cost Factor (SCF)
.68/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 14,984 SF. Values shown are in FY04 $.
Replacement
Cost:
,509,071
Building GSFT: 14,984
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,625
,365
,120
,060
Unscheduled
,465
,079
,970
,892
Renewal &
Replacement:
,512
,811
,142
Total M&R Costs:
,089
,956
,901
,095
As % of replacement:
0.52%
0.68%
1.31%
1.59%
Per gsft:
||content||
.13
.19
.68
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
1464
Sq Ft
Tankless Water Closet
10
Each
Clay Brick, Exterior, 2nd Floor
1464
Sq Ft
Urinal, Vitreous China
3
Each
Concrete, Painted, Exterior, 1st Floor
2565
Sq Ft
Circulator Pump, 1/12 HP, Hot Water
1
Each
Steel, Painted, Exterior Finish, 2nd Floor
2042
Sq Ft
Pipe & Fittings, 2" Copper, Cold Water
0.8
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
44
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.8
K Ln Ft
Aluminum Fixed Window, 12 sf, 2nd Floor
49
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.4
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
2
Each
Pipe Insulation, Cold Water
1.4
K Ln Ft
Steel Double 12'x24', Painted, Roll-up Door
3
Each
Pipe Insulation, Hot Water
0.1
K Ln Ft
Steel w/ Safety Glass, Painted, Exterior Door
1
Each
Water Heater, Electric 52 Gal.
1
Each
Steel, Painted, Exterior Door
2
Each
Pipe & Fittings, 6" Cast Iron
0.6
K Ln Ft
Metal Roof
5658
Sq Ft
Pipe & Fittings, 4" DWV PVC
0.3
K Ln Ft
Single-Ply Modified Bituminous/Thermoplastic Roof
3746
Sq Ft
Roof Drain, 4-6"
3
Each
Steel, Painted, Interior Door
9
Each
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Wood Frame, Fully Glazed, Painted, Interior Door
1
Each
Variable Air Volume Box
8
Each
Wood, Solid Core, Painted, Interior Door
39
Each
Air Conditioner, Rooftop, 20 Ton
3
Each
Concrete Interior Steps
94
Sq Ft
Fan Coil, Two-Pipe, 400 Cfm
3
Each
Metal Interior Railing, Painted
51
Ln Ft
Fire Sprinkler Head
60
Each
Concrete Block, Painted, Interior Wall Finish
6340
Sq Ft
Circuit Breaker, Main, 600 V, 800 Amp., 3 Ph.
1
Each
Fabric Interior Wall Finish
2821
Sq Ft
Distribution Panel Board
3
Each
Sheetrock, Unstippled, Interior Wall Finish
15447
Sq Ft
Motor Starter, 5-20 HP, <600 V
4
Each
Carpet, Nylon 20 oz., Low Traffic
5619
Sq Ft
Emergency Lighting Pack, 2 Light w/ Battery
6
Each
Ceramic Tile Flooring
1011
Sq Ft
Fluorescent Lighting Fixture, 160w
165
Each
Concrete, Finished Flooring
7966
Sq Ft
Incandescent Lighting Fixture, Basic, 100w
12
Each
Vinyl Tile Flooring
187
Sq Ft
Metal Halide Lighting Fixture, High Bay, 400w
9
Each
Acoustical Tile Ceiling
8516
Sq Ft
Receptacle, 120V, 15 Amp
396
Each
Metal Unpainted Interior Ceiling
5594
Sq Ft
Wiring Device, Switch
157
Each
Sheetrock, Unstippled, Ceiling
674
Sq Ft
Fire Alarm Bell, 6"
4
Each
Drinking Fountain, Vitreous China
2
Each
Fire Alarm Control Panel
1
Each
Emergency Eye Wash
1
Each
Manual Pull Station
6
Each
Emergency Shower Station
1
Each
Public Address Speaker
1
Each
Lavatory, Vitreous China
11
Each
Smoke Detector
15
Each
Service Sink, Iron Enamel
2
Each
Time Control Clock
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle