UM = SF
Construction Cost Factor (CCF)
6.00/SF, based on data provided from TriService #6, deflated to FY04 $ using a deflation
factor of 0.97.
Sustainment Cost Factor (SCF)
.10/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 12,178 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,559,393
Building GSFT: 12,178
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,777
,030
,587
,520
Unscheduled
,951
,968
,646
,546
Renewal &
Replacement:
,479
,736
,810
Total M&R Costs:
,728
,477
,969
,876
As % of replacement:
1.14%
1.44%
2.57%
3.20%
Per gsft:
||content||
.45
||content||
.85
.28
.10
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
4614
Sq Ft
Water Heater, Gas/Oil 75 Gph
1
Each
Concrete, Painted, Exterior, 1st Floor
0
Sq Ft
Pipe & Fittings, 10" Cast Iron
0.3
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
8
Each
Pipe & Fittings, 6" Cast Iron
1
K Ln Ft
Aluminum Operable Window, 12 sf, 1st Floor
10
Each
Aluminum Gutter, Downspouts, Fittings
0.5
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
4
Each
Pipe & Fittings, 4" DWV PVC
0.6
K Ln Ft
Steel Double 12'x24', Painted, Roll-up Door
2
Each
Roof Drain, 4-6"
12
Each
Steel w/ Safety Glass, Painted, Exterior Door
13
Each
Pipe & Fittings, 4" Steel, Gas
0.83
K Ln Ft
Built-up Roof
0
Sq Ft
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Metal Roof
10100
Sq Ft
Variable Air Volume Box
6
Each
Steel, Painted, Interior Door
19
Each
Air Conditioner, Rooftop, 20 Ton
2
Each
Wood, Solid Core w/ Safety Glass, Painted, Interior Door
0
Each
Fan Coil, Two-Pipe, 400 Cfm
4
Each
Wood, Solid Core, Painted, Interior Door
0
Each
Radiant Heating Panel, Electric, 8 sf
4
Each
Ceramic Tile Wall Finish
660
Sq Ft
Fire Sprinkler Head
45
Each
Concrete Block, Painted, Interior Wall Finish
19180
Sq Ft
Distribution Panel Board
3
Each
Plaster Interior Wall Finish
0
Sq Ft
Motor Starter, 50-75 HP, <600 V
8
Each
Carpet, Nylon 20 oz., High Traffic
1111
Sq Ft
Emergency Lighting Pack, 2 Light w/ Battery
3
Each
Concrete, Finished Flooring
5285
Sq Ft
Fluorescent Lighting Fixture, 160w
115
Each
Vinyl Tile Flooring
2207
Sq Ft
Metal Halide Lighting Fixture, High Bay, 400w
15
Each
Acoustical Tile Ceiling
3264
Sq Ft
Receptacle, 120V, 15 Amp
85
Each
Metal Unpainted Interior Ceiling
2560
Sq Ft
Wiring Device, Switch
42
Each
Drinking Fountain, Vitreous China
1
Each
Annunciation Panel
1
Each
Lavatory, Vitreous China
9
Each
Fire Alarm Bell, 6"
7
Each
Service Sink, Iron Enamel
2
Each
Fire Alarm Control Panel
1
Each
Shower, Ceramic Tile
10
Each
Manual Pull Station
6
Each
Tankless Water Closet
9
Each
Public Address Speaker
1
Each
Urinal, Vitreous China
8
Each
Smoke Detector
13
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
Time Control Clock
1
Each
Pipe & Fittings, 2" Copper, Cold Water
0.5
K Ln Ft
Uninterruptible Power Supply
1
Each
Pipe & Fittings, 3/4" Copper, Cold Water
1
K Ln Ft
Commercial Dishwasher
1
Each
Pipe & Fittings, 3/4" Copper, Hot Water
1.5
K Ln Ft
Commercial Walk-In Freezer/Cooler
1
Each
Pipe Insulation, Cold Water
1.5
K Ln Ft
Detention Doors & Hardware
1
Each
Pipe Insulation, Hot Water
1.5
K Ln Ft
Annual Sustainment Costs
.00
.00
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle