UM = KG
Construction Cost Factor (CCF)
.48/KG, based on
data provided by Marshall &
Swift #53/10 for well drilling costs and #17/57
for a 1000 GPM pump, and inflated to FY04 $ using an inflation factor of 1.015.
Sustainment Cost Factor (SCF)
||content||
.08/KG, the sustainment factor was calculated using data from RS
Means.