FAC
8452
Water
Pump
Facility,
Non-Potable
UM = KG
Construction
Cost
Factor
(CCF)
.42/KG,
based
on
data
provided
by
USACE
and
deflated
to FY04 $
using
deflation
factor
of
0.985.
Sustainment
Cost
Factor
(SCF)
||content||
.02/KG,
the
sustainment
factor
was
calculated
using
data
from
RS
Means.