UFC 4-133-01N
24 February 2005
Including changes 1 and 2, 7 March 2007
of water per 100 linear ft). The duct routing will be under the
access floor and coordinated with electrical and equipment wiring
routes. Access in the base of the structural columns is critical for
installing antenna cables. Diffusers will be floor grade linear type,
located at the base of the windows providing an even coverage of
glazing preventing condensation and drafts. Duct system will be
coordinated with the structure, electrical, SPAWAR, and the control
cabinet sizes and proximity to the window.
c.
ATCT cab HVAC system: The system will be located directly under
the tower cab level and consist of redundant HVAC equipment.
d. The pipe chase will be fire stopped at every floor. To prevent
freezing, the chase will be opened with louvers, one high and one
low between each floor. Provide supply grilles at every other
landing complete with fire dampers.
e. Heat and cool the elevator equipment. Consideration will be given
to ventilation air entering low and exiting high for cooling.
f.
Air-condition the corridor and electrical room.
h. Heat the fire pump room.
i.
Heat and air-condition the electronic spaces.
j.
Heat the vestibule.
k.
Air-condition the office and vestibule room.
l.
The janitor and toilet room will have ceiling-mounted exhaust fans
providing six air changes per hour minimum.
m. Air-condition and heatthe Briefing room.
n. Heat the mechanical room.
o. Heat and air-condition the tower cab. The cab will also have a
smoke removal fan controlled from the cab.
p. An elevator shaft smoke damper will be provided to meet life-safety
criteria.
q. All critical spaces will have complete redundant system with
automatic primary and secondary control to be able to maintain
temperature and ventilation requirements.
19