UFC 4-171-05
1 January 2005
with change 25 October 2006
D sample 5034-R Continued
Project Number : 10317
Project Ttle
: AR Center/OMS/AMSA/Unh Strg
Date
: Jun 30, 2005
Functional space Details - Actual/ english
214 - Maintenance - tank and Automotive
VB5
Parts Room
AMSA, SUPPLY ROOM: Centrally locate to provide ease of access from the work bays. Provide
metal shelving for storage of parts inside of caged areas n the supply room.
SUBDIVIDE AREA INTO 2 SECTIONS. WIRE/EXPANDED METAL STORAGE CAGES 2.4-METER
BY 3.7-METER (8 FT X 12 FT) WITH SLIDING DOORS FOR STORAGE. CAGES MUST EXTEND
TO WITHIN ONE INCH OF THE FLOOR AND CEILING. THIS SPACE SHOULD BE ADJACENT TO
THE TOOL AND PARTS ROOM AND DIRECTLY ACCESSABLE TO THE WORKBAYS. A MINIMUM
OF TWO DUPLEX 110V OUTLETS SHALL BE PROVIDED PER MODULE.
2 Work Bays x 8.9 SM (96 SF) = 17.8 SM (192 SF).
VB12
Flammable Storage
AMSA, FLAMMABLE STORAGE : MUST COMPLY WITH DESIGN GUIDE STANDARDS AND EPA
STANDARDS AS OF DATE OF CONSTRUCTION. DOORS MUST OPEN TO THE OUTSIDE OF
THE BUILDING.
VB13
Controlled Waste Storage
AMSA, CONTROLLED WASTE STORAGE: PROVIDE SEPERATE CONTROLLED WASTE
STORAGE FOR THE AMSA.
VD1
Work Bays
WORK BAYS: Provide one double drive-through work bays. Provide overhead cranes n the drive
through bay.
(2 WORKBAYS x 74.3 SM (800 SF)) + 59.5 SM (640 SF) = 208.1 SM (2240 SF)
Total Work Bay area = 208.1 SM (2240 SF)
VD7
References:
a. Memorandum, HQ USARC, AFRC-CIS-I, 22 July 1999, Subject: Information Technology (IT)
Requirements for Military Construction Army Reserve.
181