MIL-HDBK-1027/1B
Table 12
19F4 and 19F4A Structures
________________________________________________________________
CLASS SCHEDULE
________________________________________________________________
MON
TUE
WED
THU
FRI
AM PM
AM PM AM
PM
AM
PM AM PM
Classroom
X
X
Y
Y
Z
Structure
X
X
Y
Y
Z
________________________________________________________________
Note: Classes are designated as X, Y, Z.
________________________________________________________________
PROPANE USAGE
________________________________________________________________
NO. OF
PROPANE
CLASS
FIRES/
PROPANE
USE PER
TOTAL
OF
CLASS OF
FIRE
DEMAND
FIRE
PROPANE/
L3
FIRE
63 MEN
TYPE
L/s
CLASS
First Day PM
6
Fixed Wing
2549
5/
283 000
1 698 000
B
Second Day PM
6
Helicopter
2549
5/
283 000
1 698 000
B
B
3
Gas Tank
34
6198
18 593
___
_____________
15 Fires/
3 414 593 L/
Class
class
12 496 L/
class
________________________________________________________________
Notes: 1. Propane consumption and demand for the 1-day class
are the same as those for the 2-day class.
2. The design propane demand for the bldg. is 2549 L/s.
3. Propane is based on a gas pressure at the burner
of 14 kPa.
4. Propane supply pressure at the trainer entry (device
contractor hookup) should be 69 kPa.
5. The average propane demand is 944 L/s.
116