the building that qualify as inhabited, including "inside" windows exposed by the
hangar bay. Thermal insulated glass should have a laminated glass pane on the
inside (occupied side) of the window assembly.
3-18.5
Louvers. Provide louvers as required by the mechanical system.
Choose anodized aluminum with integral bird screens. Louvers will be the
drainable design type.
3-18.6
Miscellaneous Items. Provide a roof access hatch.
3-19
INTERIOR MATERIALS AND SYSTEMS
3-19.1
Floors. Ground floor should be a concrete slab on grade.
Reinforce and install slabs over a vapor barrier and compacted porous fill, unless
an alternative construction is recommended based on a subsurface investigation.
3-19.2
Walls and Partitions.
||content||
\ First floor walls shall be a minimum of
200 mm (8 inch) nominal reinforced concrete masonry units or be constructed to
provide an equivalent fire rating. /1/ Extend partitions to floor slab above around
shops and to ceiling in other locations. Partitions around administrative areas
may be gypsum wallboard on metal studs, except around shop areas. Partitions
between hangar and O1/O2 spaces should be masonry. Choose insulated
partitions for acoustical control as needed. Partitions should be fire rated as
required by NFPA 409.
3-19.3
Stairs. Construct stairs of steel with concrete filled treads.
Handrails and guardrails should be steel tubing.
3-19.4
Doors & Frames. Choose metal doors with metal frames on the
O1 level. Doors around the Paraloft, aviation ordnance (AO,) aviation mechanics
equipment (AME) or any space that may contain explosives must be compliant
for blast protection per the appropriate design guides. Such features may
include out-swinging doors and panic devices.
3-19.5
Hardware. Choose hardware appropriate for the spaces served.
Special hardware includes:
3-19.5.1
Mechanical Cipher locks may be desired on some shops and
spaces where security is required. Coordinate the requirement with the activity.
Cipher locks may be considered on the following spaces:
Commanding Officer's (CO) office
Executive Officer's (XO) office
Operations