Activity Lead
CODE 1 ACTIVITIES
Customer
PM
PA
CS
/PE
Master Plan revision has been initiated.)
c. Provide Real Property Master Plans of the Installation indicating
the locations of the existing utilities and roads on and adjacent to
X
the proposed project site.
d. Check to see if a topographic survey and soils investigation have
X
X
recently been performed.
e. Determine if a topographic survey and/or soils investigation will
be completed by in-house staff or contract A/E. Initiate necessary
X
X
A/E actions.
f. Determine if energy conservation, passive/active solar studies
X
X
have been completed by the Installation or need to be
accomplished.
g. Provide any existing fuel and utilities studies applicable to the
X
project site.
h. Obtain confirmation that an Environmental Assessment (EA) or
Environmental Impact Statement (EIS), as applicable, has been
X
prepared and approved.
i. Request site category code from the Installation to determine if
hazardous materials are present and need to be abated in
X
X
accordance with AR 200-1 (Reference 4-2)
j. Review the project scope and the Programmed Amount (PA).
Site development costs can normally be expected to be 25 to 40% of
X
X
X
the project cost.
k. Establish the initial project delivery team.
X
X
X
l. Develop the project schedule and enter in PROMIS
X
m. Schedule Project Definition Conference. Notify participants in
X
writing of the meeting date, time, and place.
n. Prepare and Staff Acquisition Plan
X
X
X
REFERENCES
4-1
ER 5-1-11, "Programs and Project Management", 27 Feb 1998
4-2
AR 200-1, "Environmental Protection and Enhancement," 21 Feb 1997
4-3
AR 415-15