Project Name
Project Number
UEPH Complex
Statement of Work
26 November 2001
CHAPTER 12 FIRE PROTECTION
Paragraph
12-1
DESIGN STANDARDS AND CODES ............................................... 144
12-2
HYDRANT FLOW DATA................................................................... 144
12-3
SPRINKLER SYSTEM ...................................................................... 144
12-4
FIRE PUMP....................................................................................... 145
12-5
STANDPIPE AND HOSE SYSTEM .................................................. 145
12-6
BUILDING CONSTRUCTION ........................................................... 145
12-7
FIRE ALARM..................................................................................... 145
CHAPTER 13 SUSTAINABLE DESIGN
Paragraph
13-1
SUSTAINABLE DESIGN GOALS ..................................................... 147
13-2
PROJECT REQUIREMENTS ........................................................... 147
APPENDIX A REFERENCES................................................................................... 148
TABLES
Table
Title
Page
2.1
Locker Room Plumbing Fixture and Locker Quantities ......................................... 37
4.1
Soil Compaction .................................................................................................... 84
4.2
Minimum Pipe Insulation Thickness (mm) For Steam (100 to 2.800 kPa (gage))
and High Temperature Hot Water Supply and Return (120 to 230 degrees C).. 96
4.3
Minimum Pipe Insulation Thickness (inches) For Steam (16 to 408 psig) and
High Temperature Hot Water Supply and Return (250 to 450 degrees F)
97
4.4
Minimum Pipe Insulation Thickness (mm) For Condensate Return and High
Temperature Hot Water Return System
97
4.5
Minimum Pipe Insulation Thickness (inches) For Condensate Return and High
Temperature Hot Water Return System ............................................................. 98
10.1
Weather Data ........................................................................................................ 122
10.2
Internal Loads UEPH Buildings .......................................................................... 123
10.3
Internal Loads Company Operations Facilities ................................................... 123
10.4
Internal Loads Battalion and Brigade HQ Buildings ........................................... 124
iv