DG 1110.3.120
DESIGN GUIDE: MUSIC AND DRAMA CENTERS
JANUARY 1981
C H A P T E R 2: COMPLETION RECORDS
Individual projects will require the assembly of
completion records prepared in accordance with
AR 415-10 and current Engineering Regulations.
Generally, the material to be included in these
records will cover major design intention for the
utilization of interior spaces and built-in design
features. Records are turned over at the end of
construction and include as-built drawings,
equipment manufacturers' warranties and main-
tenance instructions, parts lists, valve and switch
schedules, etc.
equipment and custom design involved in the
MDC, an extra effort should be made to correlate
normal completion records with additional use-
ful information in a readable format.
It should include a summary of how the program
and functional requirements were developed,
memoranda of subsequent design reviews, rec-
ommendations of consultants, and modifica-
tions introduced during construction. Since the
facility occupants may be new to it, every piece
a valuable aid to making the best use of it.
2-25