Design Guide: Recreation Centers Case Studies January 1976
Problem 3: New programs have been added
after plans were developed and do not have
space allocated to them.
Response: Redecorate: Change the function
of spaces: the quiet reading room could become
a Special Interest room if a storage wall and
counter are added. Add functions to existing
space: a free-standing ITT office and lounge
could be developed in the lobby space.
Remodel: Reduce the size of the ballroom and
use the remaining space for new programs.
Figure 6-14 Renovations for Special Interest Room, TV Lounge and ITT Booth
6-27