MIL-HDBK-1025/10
Energized crossing structure
4
Tensioner
4
4
3
5
5
1
3
2
2
3.2 kilometers (2 miles)
2
Reel
Maximum
1
Conductor being pulled
2
Protective ground connection
3 Safety barrier required
Traveler ground on
4
stringing block
5 Running ground
Figure 8
Composite Stringing/Removing the Temporary Protective Grounds on
Overhead Conductor Lines
Table 29
Conductor Ground Location After Pulling
I.
Structure grounds
A. Ground at each structure next to intermediate deadends of the stringing operation.
B. Ground at each structure where and while work (including clipping-in) is being
performed on or near the conductor.
II. Removal. Remove grounds as the last phase of finished aerial installation.
42