MIL-HDBK-1025/10
1
1 To shore medium-voltage distribution system
2 Primary selector switch
12
Abbreviations:
3 Fused primary disconnect switch
2
CB Circuit breaker
3
CS Control switch
10 SUBSTATION
11
ET Emergency trip
LR Local remote control
7
5 Main CB with CS and ET pushbutton
6 Feeder CB with CS and LR
4
7 Feeder CB with CS only
5
VAULT
SHIP POWER
PIER POWER
8 Pier receptacle and plug with remote CB control
6
9 ET pushbutton
7
7
6
10 To vault power
11 To meters and control power
9
8
12 Vault alarm circuits
PIER OUTLET
ASSEMBLY
SHIP
Figure 14
Preferred Ship-to-Shore Circuit Arrangement
9.3.2.2 Specific Shore-to-Ship Electrical System Safety. This section covers
connection of portable power cables to shore electrical receptacles and ship electrical buses.
Connection is a divided responsibility as covered by Table 38.
Note
Always follow the procedures given in Figure 15 to ensure that energizing
the ship is done in a safe manner.