UFC 3-600-02
1 January 2001
Table 3-2. MFH Residential Sprinkler Systems ITM Tasks
Component
Tasks
Change of
1. Sprinkler Heads
1. Inspect all heads.
Occupancy
2. Clean or replace heads (as
necessary).
3. Inspect ceilings/wall at head
for signs of leakage or water
stains.
2. Valves
1. Inspect all valves to ensure
they are open and sealed.
3. Waterflow and Alarm
1. Test to verify operability.
Devices
20 Years
1. Fast Response Spri nkler 1. Test a sample of heads or
Heads
replace.
3-3