CEMP-E/CECW-E
EI 01D010
1 September 1997
d. USACE may or may not be involved in all the
In general, the identification, study, decision, design,
above phases of an HTRW project. Frequently,
and remedial action processes are similar to
USACE takes responsibility for an HTRW project
CERCLA and have similar cost engineering
after the ROD has been completed. For those project
implications. RCRA terminology differs from
phases for which USACE is responsible, the cost
CERCLA as follows:
engineer must be involved in development and/or
review of project cost estimates for remedial action.
RCRA
CERCLA
RCRA Facility Assessment (RFA)
PA/SI
RCRA Facility Investigation (RFI)
RI
Corrective Measures Study (CMS)
FS
Corrective Measures
Implementation (CMI)
RD/RA
2-8