UM = EA
Construction Cost Factor (CCF)
,658,097.65/EA, based on data provided from USACE, deflated to FY04 $ using a deflation
factor of 0.985. An EA is defined as a facility with 16 stations with washwater recycling.
Sustainment Cost Factor (SCF)
8,488.43/EA, the sustainment factor was calculated using the ratio from FAC 2141 (2.08%) as
no other auditable data was available.