UM = EA
Construction Cost Factor (CCF)
,814.16/EA, based on data provided from USACE, using a weighted average of the various
facilities within the FAC and deflated/inflated to FY04 $ using the appropriate inflation/deflation factor.
Sustainment Cost Factor (SCF)
6.04/EA, the sustainment factor was calculated using a ratio from FAC 7384 (0.84%) as no
other auditable data was available.
NO LAYOUT AVAILABLE