UM = EA
Construction Cost Factor (CCF)
,505.00/EA, based upon analysis of the multiple Army category codes within this FAC.
Whenever possible an auditable source (USACE documentation, etc.) was used, but as the majority of the
facilities in this FAC are unique (rappel towers, hand-to-hand pits) in many cases an engineering evaluation
was made to identify components of real property that would be constructed and then costed using
commercial pricing guides.
Sustainment Cost Factor (SCF)
||content||
,721.07/FP, based on the ratio from FAC 7522 (2.31%) as no other auditable sources were
available.