UM = EA
Characteristics:
None available
Construction Cost Factor (CCF)
||content||
,121,331.50/FP, based upon analysis of Army category codes 17911 and 17912, and on a design
from a previous version of TC 25-8. At present time, the ranges in this FAC are not in the current TC 25-8,
nor is a layout available.
Sustainment Cost Factor (SCF)
,380.64/FP, based on RS Means data and Source 1 SCFs developed for other FACs (i.e. FAC
8712 Retaining Structure), and using the components listed in the USACE standard drawings. SCF was
based upon FAC 1771.
Sustainable components for this FAC are:
N/A
No layout available.